In a nutshell.. i did an emergency tank transfer when my 90g cracked.. found a tank local and picked it up. Had not been used by the second owner yet and had only bulkheads and a standpipe. Built the plumbing with massive help from my great friend John ( NasoTang)... but when turned on.. the vibration of the durso caused the drain pipe slip slightly and now it leaks. It seems to us now that the 2" bulkead BARELY covers the cut hole in the overflow. So all we can think of to try is a @.2.25 bulkhead is needed .. We have tried over and over to line up this bulhead , but the coverage is so small that it's about impossible.
I'll hafta cut out the bulkhead , as it is glued.
Are there ANY plumbing savvy reefers I can Hire/ Bribe to help me out here, and anybody know if i can find a 2.25" bulkhead ANYWHERE local to Murrieta QUICK? My livestock /sand /rock is in this setup already, and can't bear the thought of starting over again.. I'll prob just throw in the towel in all seriousness..
PLEASE LMK if you can help me out .. I am at the end of my rope here Guys ;(
Thank you,
Jami
p.s. Did I mention.. I know nothing of plumbing ? And after absorbing most of John's Saturday and part of his Sunday, he had to go tend to his actual life today, understandably ..